Column Base Plate Design (AISC Design Guide 1)
Introduction
A column base plate spreads the column's load over the concrete pedestal or footing below it. Under axial load alone, the plate has to be large enough for the concrete to carry the bearing pressure and thick enough to bend over its overhangs. Add a moment and the pressure shifts toward one edge. Past a certain eccentricity, the other edge tries to lift, and the anchor rods on that side have to hold it down. Add a shear, and the anchor rods and the weld to the column carry it into the base.
In this post, we walk through base plate design for axial load, moment and shear using AISC Design Guide 1, Base Plate and Anchor Rod Design (2nd Edition), and AISC 360, then solve an example with CalcBook's Base Plate module.

Our video works through the same base plate, from the concrete under the plate to the pull in the anchor rods:
Factors to Consider when Designing Base Plates
Concrete bearing strength: AISC 360 Section J8 limits the bearing stress under the plate. In LRFD, fp(max) = φc(0.85f′c)√(A2/A1) ≤ φc(1.7f′c), with φc = 0.65. A1 is the plate area and A2 is the largest area of the supporting surface that is geometrically similar to and concentric with it, so a pedestal wider than the plate raises the limit by a factor of up to 2.
Eccentricity: Design Guide 1 treats the moment as an eccentric axial load, e = Mu/Pu (Eq. 3.3.6), and compares it with the critical eccentricity, ecrit = N/2 − Pu/(2qmax) (Eq. 3.3.7). Here qmax = fp(max)B is the largest bearing force per unit length of the plate.
Small moment (e ≤ ecrit): the concrete balances the column on its own, with the bearing stress spread over a length Y = N − 2e (Eq. 3.3.8). The anchor rods carry no tension from the moment.
Large moment (e > ecrit): the bearing stress is capped at fp(max), so the anchor rods on the tension side pull down to keep the plate in equilibrium. Design Guide 1 solves for the bearing length Y (Eq. 3.4.3) and the rod tension Tu = qmaxY − Pu (Eq. 3.4.2). A solution exists only if (f + N/2)² ≥ 2Pu(e + f)/qmax (Eq. 3.4.4), where f is the distance from the anchor rods to the plate center. If it doesn't, the plate is too short to develop the rod force.
Plate bending: the plate bends as a cantilever beyond lines inside the column. For a W shape, the cantilevers are m = (N − 0.95d)/2 and n = (B − 0.8bf)/2 (Section 3.1.2); under axial load alone, a third length, λn′, is included as well. The plate has to resist the bearing pressure on the compression side and the anchor rod pull on the tension side.
Anchor rods: the rod steel is checked in tension, with Fnt = 0.75Fu, and in shear, with Fnv = 0.450Fu (threads not excluded), both from AISC 360-22 Table J3.2, with φ = 0.75 (Section J3.7). A rod that carries both is checked for combined tension and shear per Section J3.8. When the plate sits on a built-up grout pad, ACI 318-19 Section 17.7.1.2.1 takes 0.80 of the anchor steel shear strength.
Column weld: with the column end finished to bear, the axial compression goes into the plate by bearing (AISC 360-22 Sections J1.4(a) and M4.4), so the weld carries the moment, the shear and any uplift. By the elastic method, the flange welds take the moment and the web welds take the shear. The flange welds are loaded across their axis, so they get the directional strength increase of Eq. J2-5.
Bearing stress distribution: Design Guide 1 uses a uniform bearing stress block in Section 3.3 and permits a triangular distribution as an alternative (Appendix B).
Important Details to Be Aware of
Finished to bear: the weld check takes the column end as finished to bear on the plate (AISC 360-22 Section M4.4). If it isn't, untick Column Finished to Bear on Base Plate, and the weld carries the compression too.
Grout pad: the Grout Pad option applies the ACI 318-19 0.80 factor to the anchor rod shear strength, in both the shear check and the combined tension and shear check.
Anchorage into the concrete: the rods' embedment, and the concrete's breakout, pullout and side-face blowout strengths, follow ACI 318 Chapter 17.
Example Problem (Solved with CalcBook):
Problem statement:
A W12×96 column bends about its strong axis on a 24 in. × 24 in. × 2-1/2 in. base plate (Fy = 50 ksi), centered on a 28 in. × 28 in. concrete pedestal (f′c = 4,000 psi) with a grout pad between them. Four 1-1/4 in. diameter ASTM F1554 Grade 36 anchor rods (Fu = 58 ksi), two per row, are set 3-1/2 in. from the plate edges. The column carries a dead load of 100 kips, a live load of 150 kips and a live load moment of 215 kip-ft. Its end is finished to bear on the plate and welded with 5/8 in. E70 fillet welds on all faces (column Fu = 65 ksi). Check the base plate by LRFD (AISC 360-22) with a uniform bearing stress distribution. Step 10 adds a live load shear of 20 kips.
Step 1: Design Inputs
Step 1: Design Inputs
In CalcBook's Base Plate module, choose the column shape and the bending axis, then enter the plate, the pedestal and the anchor rods. The rods are placed by one edge distance, le, measured from the plate edge to the rod center in both directions:
sd = N − 2le = 24 in. − 2 × 3.5 in. = 17 in.
f = sd/2 = 17 in./2 = 8.5 in.
Under Analysis Options, tick Grout Pad Between Base Plate and Concrete and Design Column-to-Base Plate Weld. The weld inputs (Step 12) and the resistance factors follow.

The drawing at the top of this post is CalcBook's plan and Section A-A for this example. It redraws as the inputs change.
Step 2: Loads and Load Combinations
The axial load, the moment and the shear are entered by load type on the Demand tab. With the ASCE 7-22 combinations, LRFD LC2a (1.2D + 1.6L + 0.5Lr) governs every check:
Pu = 1.2(100 kips) + 1.6(150 kips) = 360 kips
Mu = 1.6(215 kip-ft) = 344 kip-ft
The shear in the tables is the one Step 10 adds. It doesn't change Steps 3 to 9.


Step 3: Concrete Bearing Strength
A1 = BN = 24 in. × 24 in. = 576 in.²
A2 = (28 in./24 in.)² × 576 in.² = 784 in.², the full pedestal area here
√(A2/A1) = √(784/576) = 1.17, partial confinement (between 1 and 2)
fp(max) = φc(0.85f′c)√(A2/A1) = 0.65 × 0.85 × 4 ksi × 1.17 = 2.58 ksi
qmax = fp(max)B = 2.58 ksi × 24 in. = 61.88 kips/in.

Step 4: Small or Large Moment?
e = Mu/Pu = (344 kip-ft × 12 in./ft)/360 kips = 11.47 in.
ecrit = N/2 − Pu/(2qmax) = 24 in./2 − 360 kips/(2 × 61.88 kips/in.) = 9.09 in.
Since e = 11.47 in. is greater than ecrit = 9.09 in., this is the large moment case: the concrete alone can't balance the column, and the anchor rods on the tension side carry load.

Step 5: Bearing Length and Anchor Rod Tension
With Mu = 344 kip-ft × 12 in./ft = 4,128 kip-in., Puf = 360 kips × 8.5 in. = 3,060 kip-in. and f + N/2 = 8.5 in. + 12 in. = 20.5 in.:
Y = (f + N/2) − √[(f + N/2)² − 2(Mu + Puf)/qmax] = 20.5 in. − √[(20.5 in.)² − 2(4,128 + 3,060) kip-in./61.88 kips/in.] = 6.79 in. (Eq. 3.4.3)
Tu = qmaxY − Pu = 61.88 kips/in. × 6.79 in. − 360 kips = 60.24 kips (Eq. 3.4.2)
The two rods in the tension row share it: Trod = 60.24 kips/2 = 30.12 kips per rod.

Step 6: Concrete Bearing Check
Design Guide 1 Eq. 3.4.4 is the condition for a real solution in Step 5: the plate has to be long enough for a full-strength bearing block to balance the moment about the anchor rods. CalcBook writes it as a ratio:
Rc = 2(Mu + Puf)/[qmax(f + N/2)²] = 2(4,128 + 3,060) kip-in./[61.88 kips/in. × (20.5 in.)²] = 0.55 ≤ 1.0, OK
Rc is not a bearing stress ratio. Past ecrit, the bearing stress is already at fp(max), and the concrete carries qmaxY = Pu + Tu = 360 kips + 60.24 kips = 420.24 kips. Rc measures how close the plate is to the Eq. 3.4.4 limit: at Rc = 1.0, the bearing block would reach the anchor rods (Y = f + N/2).
In force terms, CalcBook compares the force a bearing block over the full length f + N/2 would need with the design bearing capacity over that length:
C = 2(Mu + Puf)/(f + N/2) = 2 × 7,188 kip-in./20.5 in. = 701.27 kips
φcPp = φc(0.85f′c)√(A2/A1)B(f + N/2) = 0.65 × 0.85 × 4 ksi × 1.17 × 24 in. × 20.5 in. = 1,268.54 kips
701.27 kips/1,268.54 kips = 0.55, the same ratio.

Step 7: Plate Flexure at the Bearing Interface
m = (N − 0.95d)/2 = (24 in. − 0.95 × 12.7 in.)/2 = 5.97 in.
n = (B − 0.8bf)/2 = (24 in. − 0.8 × 12.2 in.)/2 = 7.12 in.
l = max(m, n) = 7.12 in. (Design Guide 1, Section 3.3.2 note)

The bearing stress is at fp(max) = 2.58 ksi over Y = 6.79 in., which is shorter than l, so the plate moment over the full width B is:
Mupl = fpY(l − Y/2)B = 2.58 ksi × 6.79 in. × (7.12 in. − 6.79 in./2) × 24 in. = 130.43 kip-ft (Eq. 3.3.12)
φbMn = φbFyBtp²/4 = 0.90 × 50 ksi × 24 in. × (2.5 in.)²/4 = 140.63 kip-ft
130.43 kip-ft/140.63 kip-ft = 0.93, OK. Equivalently, the required thickness is tp(req) = 2.41 in. ≤ 2-1/2 in. (Eq. 3.3.15a).

Step 8: Plate Flexure at the Tension Interface
On the tension side, the rod pull bends the plate over the lever arm from the anchor rods to the center of the column flange:
x = f − d/2 + tf/2 = 8.5 in. − 12.7 in./2 + 0.9 in./2 = 2.6 in. (Eq. 3.4.6)
φbTn = φbbeffFytp²/(4x) = 0.90 × 24 in. × 50 ksi × (2.5 in.)²/(4 × 2.6 in.) = 649.04 kips, with beff = 24 in., the full plate width
Tu = 60.24 kips ≤ 649.04 kips (D/C = 0.09), OK. The required thickness on this side is tp(req) = 0.76 in. (Eq. 3.4.7a).

Step 9: Anchor Rod Tension
Ab = πdrod²/4 = π(1.25 in.)²/4 = 1.23 in.²
Fnt = 0.75Fu = 0.75 × 58 ksi = 43.5 ksi (AISC 360 Table J3.2)
φRn = φFntAb = 0.75 × 43.5 ksi × 1.23 in.² = 40.04 kips (AISC 360-22 Section J3.7)
Trod = 30.12 kips ≤ 40.04 kips (D/C = 0.75), OK

Step 10: Add a Base Shear
Our video covers axial load and moment. To show the shear checks, this example adds a live load shear of VL = 20 kips acting with the moment. P and M don't change, so Steps 1 to 9 stay the same.
Vu = 1.6(20 kips) = 32 kips (LRFD LC2a)
All four rods share the shear: Vrod = Vu/nrods = 32 kips/4 = 8 kips
Fnv = 0.450Fu = 0.450 × 58 ksi = 26.1 ksi (AISC 360-22 Table J3.2, threads not excluded)
With the grout pad: Rnv = 0.80FnvAb = 0.80 × 26.1 ksi × 1.23 in.² = 25.62 kips (AISC 360-22 Eq. J3-1; ACI 318-19 Section 17.7.1.2.1)
φRnv = 0.75 × 25.62 kips = 19.22 kips
Vrod = 8 kips ≤ 19.22 kips (D/C = 0.42), OK


Step 11: Combined Tension and Shear in the Anchor Rods
Each rod in the tension row now carries both. AISC 360-22 Section J3.8 lowers its tensile stress for the shear stress it carries:
frv = Vrod/Ab = 8 kips/1.23 in.² = 6.52 ksi
F′nt = 1.3Fnt − Fnt/(φ × 0.80Fnv) × frv = 1.3 × 43.5 ksi − 43.5 ksi/(0.75 × 0.80 × 26.1 ksi) × 6.52 ksi = 38.44 ksi ≤ Fnt = 43.5 ksi (Eq. J3-3a, with the grout pad's 0.80 on Fnv)
φRn = φF′ntAb = 0.75 × 38.44 ksi × 1.23 in.² = 35.38 kips (Eq. J3-2)
Trod = 30.12 kips ≤ 35.38 kips (D/C = 0.85), OK. The shear takes the rods from 0.75 in Step 9 to 0.85.
Step 12: Column Weld
The column end is finished to bear, so the 360 kips of compression goes into the plate by bearing (AISC 360-22 Sections J1.4(a) and M4.4), and the weld carries the moment and the shear. With fillet welds on all faces, the inside flange faces add weld clear of the column fillets:
lfi = bf − tw − 2(kdes − tf) = 12.2 in. − 0.55 in. − 2(1.5 in. − 0.9 in.) = 10.45 in. per flange
Sw = bfd + lfi(d − 2tf)²/d = 12.2 in. × 12.7 in. + 10.45 in. × (12.7 in. − 2 × 0.9 in.)²/12.7 in. = 252.7 in.²
fM = Mu/Sw = 4,128 kip-in./252.7 in.² = 16.34 kips/in. on the flange welds
fV = Vu/lv = 32 kips/[2(12.7 in. − 2 × 1.5 in.)] = 32 kips/19.4 in. = 1.65 kips/in. on the web welds

The flange welds are loaded across their axis (θ = 90°), so they get the directional increase:
Fnw = 0.60FEXX(1.0 + 0.50sin1.5θ) = 0.60 × 70 ksi × 1.5 = 63 ksi (AISC 360-22 Eqs. J2-4 and J2-5)
φRnw = φFnw(0.707w) = 0.75 × 63 ksi × 0.707 × 0.625 in. = 20.88 kips/in.
fM = 16.34 kips/in. ≤ 20.88 kips/in. (D/C = 0.78), OK
The flange welds govern, since fM/1.5 = 10.89 kips/in. is more than the web welds' 1.65 kips/in. A 5/16 in. weld would give 10.44 kips/in. (D/C = 1.56), so a moment this size needs the larger weld.
The column web is also checked for shear rupture along the web welds, with the welds on both sides sharing its thickness: φRn = 0.75 × 0.60 × 65 ksi × 0.55 in./2 = 8.04 kips/in. ≥ 1.65 kips/in. (D/C = 0.21), OK (AISC 360-22 Eq. J4-4)

Result
All eight checks pass. Plate bending at the bearing interface still governs (D/C = 0.93), so the 2-1/2 in. plate is close to its limit. The shear takes the anchor rods from 0.75 to 0.85 under combined tension and shear, and the 5/8 in. column weld is at 0.78.

With a smaller moment: at Mu = 150 kip-ft, e = 5.00 in. is less than ecrit = 9.09 in. The concrete balances the column over Y = N − 2e = 14 in., at a bearing stress of Pu/(BY) = 360 kips/(24 in. × 14 in.) = 1.07 ksi, 42% of fp(max). The anchor rods carry no tension, so the tension-side checks drop out: plate flexure is at 0.39 and the Step 6 concrete ratio at 0.37. The shear checks don't depend on the moment (rod shear 0.42, column base metal 0.21), and the column weld drops to 0.34.
Conclusion
Under axial load, moment and shear, a base plate works with the concrete below it, the anchor rods and the weld to the column. Design Guide 1 and AISC 360 turn that into a short sequence: the concrete's bearing limit, the eccentricity against ecrit, the bearing length and rod tension, the plate thickness and the rod strength, and then the rod shear, the combined tension and shear, and the column weld.
CalcBook's Base Plate module runs the same sequence for I-shaped (W, M, S and HP), rectangular HSS, and round HSS or pipe columns, for small and large moments and net uplift, with uniform or triangular bearing, an optional grout pad and the column weld, and shows the steps with their Design Guide 1, AISC and ACI references. Change the plate, the rod layout, the weld or the loads, and every check updates.
Related design examples: eccentric spread footing design and moment frame design.